The shutters are no longer down- walls are going in.
The future dining/fellowship room mostly has a floor- finish framing it in tomorrow, and 4 walls. The sliding glass door is not in place yet. Plumbing starts tomorrow by a contractor, and electricity has begun.
The entryway and toilets are framed and cement poured. Need to build something that looks like an entryway and put a cross on it.
The men poured the footings for the wall in the santuary as well- the floor in there will have to wait until funds are in hand.
With only Wednesday and Thursday fro Harvest, the weeks go by very fast.
As a result the launch team decided to put off the official start until November. That should give lots of time to get things moving- maybe even have parking by then.